Verify

Confidence needs
a measurement boundary.

Every material claim should answer four questions: what happened, where it happened, how it was measured and what it does not prove. Dunfaire keeps those answers beside the result.

CLAIM REGISTERScope before certainty
ClaimResultScopeMethodStatus
Queue reduction6,988 → 54One customer applianceMeasuredverified
Offline vendor data53,584 assignmentsShipped IEEE datasetCount + checksumverified
Recurrence handling24-hour suppressionClosed same conditionBehaviour testimplemented
Stale alert handling7-day close eligibilityUnowned + no fresh evidenceBehaviour testimplemented
Future connectorNo production claimDefined roadmap onlyNot yet testabledevelopment

Illustrative public claim register based on currently documented behaviour. Production verification should be repeated against the agreed environment and test plan.

Maturity language

No connector wall.
No implied availability.

Integrations and capabilities carry an explicit maturity label. If a backend capability is unavailable, the control is disabled and the empty state explains why.

01

Verified

A defined test has been run against the stated scope and the result can be inspected.

02

Implemented

The capability exists and has behaviour-level evidence, but is not presented as a broader field result.

03

In development

Work is planned or underway. It is not represented as available production capability.

Your test plan

Bring the conditions
that matter to you.

  1. 01Define the estate and evidence sources in scope.
  2. 02State the expected identity, grouping and recurrence behaviour.
  3. 03Measure the queue and retain raw before/after evidence.
  4. 04Record limits, exceptions and environmental variables.
Design a verification session

A claim should survive your own test plan.

Challenge a claim